Starting MDCC Ops…
Loading the workspace
Disclaimer

The premise of the orchestration system is that structural and concrete works must always remain ready to receive succeeding finish and interior scopes without delay. The transition gap between concrete completion and interior object installation should be minimised through continuous coordination, ensuring that downstream trades, finishes, fixtures, and modular components can immediately proceed once structural readiness is achieved.

Source files (drawings, IFC, STEP)

Tables produced by this bid

Cost table (BOQ)

Loads automatically when a snapshot is open. The cost table shows every line item, quantity, and rate from the BOQ Excel.

Scope coverage

Loads automatically when a snapshot is open. Click any row to highlight that element in the 3D model.

Add Files

Choose where these files should go. From SharePoint is on this list — it pulls into Live Bid Package.
Sign in with Microsoft to pull SharePoint. Chat → Settings is IT-only.